We are rebuilding the former Lasker Rink and Pool to better integrate the facility into the landscape, offer new and enhanced outdoor activities, and increase access for communities around the north end of Central Park.

The transformation of the Lasker Rink and Pool site on the Harlem Meer is the most significant and complex project ever undertaken by the Conservancy. It represents the culmination of our work to re-establish the north end of the Park as a vital resource for the surrounding community. When complete, the fully accessible Davis Center will offer new and enhanced outdoor activities and provide unhindered access across the north end of the Park—both by reconnecting the watercourse that travels through the Ravine, allowing it to run unobstructed from the Pool into the Meer, and re-establishing the pedestrian path that was once alongside it.

With ongoing input from our community and interested user groups, we have designed this state-of-the-art facility to reflect both our visitors’ priorities and the spirit of Central Park’s original purpose. The new-and-improved Davis Center will invite expanded recreational and leisure activities, help us engage more deeply with our Park neighbors, and offer more ways for the community to enjoy this diverse and beautiful naturalistic setting in the heart of New York.

About the Restoration

When completed, the new Davis Center will provide:

  • Year-round free and low-cost programming and expanded recreational opportunities, with increased access to nature
  • Enhanced swimming and skating, including a full-scale ice rink, a larger-than-Olympic-size pool, and a new outdoor spray pad
  • Year-round access to restrooms and amenities and more community programming
  • A boardwalk through freshwater marsh plantings at the edge of the water body
  • Unhindered access across the north end of the Park

The design has been led by the Central Park Conservancy and Susan T. Rodriguez Architecture & Design in collaboration with Mitchell Giurgola.

Construction Updates

Significant progress has been made since breaking ground in September 2021. The superstructure is complete, site utilities have been installed and the exterior stone façade is going up. Inside the building, contractors are installing lockers in the men’s and women’s rooms and setting wall tiles.

On the exterior, the contractor is pouring the concrete deck for the pool, and placing soil and boulders on the green roof. Marshland plantings have been planted along the southern shoreline to enrich the scenic character and habitat value. We are also in the process of creating a diverse array of year-round free and low-cost programming to be offered at the new center.

Harlem Meer Center 20240430 20 Davis Center 20241217 06 Harlem Meer Center 20240827 19 The Harlem Meer Pool Concrete Poor 20240507 31 Harlem Meer Center 20240919 34 Harlem Meer Center 20240919 43 Harlem Meer Center Aquatic Planting 20240710 18 Harlem Meer Center Aquatic Planting 20240710 26 Harlem Meer Center Constr 20231212 58 Harlem Meer Center Constr 20231212 104 Harlem Meer Center Constr 20231212 116 Harlem Meer Center snow 20240119 01

Stay Connected and Informed

Sign up to receive updates on this project and other news from the north end of the Park.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

The view from the Ravine through Huddlestone Arch, before and after reconstruction (rendering)

A rendering of the planned pavilion interior

A light-filled gathering space will open onto the deck of the new pool

Project FAQs

Q: What kinds of programming will the Davis Center host?

In dialogue with the surrounding communities, we are developing a variety of year-round programming opportunities. As the project nears completion, we will publish more details about the center’s programs and events.

Q: How big will the facility be?

The new facility will take the shape of an elongated oval, measuring 280 feet by 120 feet.

The new pool will be larger than an Olympic-size pool. It will be the eighth-largest pool in New York City—making it one of a handful of City pools that can accommodate 50-meter lap swimming.

The new facility will also feature a full-size ice rink that can support tournaments and/or championships.

Q: Will the new design support existing uses like lap swimming, recreational skating, and hockey programming?

Yes. The new pool will accommodate the same uses as the existing pool, including recreational and lap swimming, and a regulation-size rink will support a robust skating and hockey program. In addition, the new facility will be open year-round to support community-focused programming during the spring and fall.

Q: I want to go swimming or ice skating, but the Lasker Rink and Pool is closed. Where can I go?

Upper Manhattan is well served by several large public pools, such as Highbridge Pool (Washington Heights), Jackie Robinson (North Harlem), Marcus Garvey (Harlem), Frederick Douglass (West Harlem), Wagner (East Harlem), Thomas Jefferson (East Harlem), and John Jay (Upper East Side). Swimmers also have the option to use the Riverbank State Pool (West Harlem).

In the winter, you can visit Central Park’s Wollman Rink for ice skating.

Also in the area