Reconstruction of the East 72nd Street Playground enhanced accessibility, updated the adventure-style play elements, and further integrated the playground into the surrounding landscape.
The East 72nd Street Playground was built in 1936. It was rebuilt in 1970, according to a design by architect Richard Dattner. The playground was one of several in the Park that were rebuilt in the adventure style in the late 1960s and early 1970s. Adventure-style playgrounds feature interconnected play structures that encourage exploration and imaginative play. The Conservancy later rehabilitated the playground in the late 1990s to meet national standards for playground safety and improve the Park based on feedback from its users.
Our most recent reconstruction, which was completed in 2015, aimed to honor the spirit of the existing design while modernizing it for current-day use. In an effort to integrate the playground more effectively into the landscape, we removed the fence and replaced it with a low seat wall. This wall mirrors the outer edge of the play zone. Benches are staggered along the wall to provide seating, interspersed with openings that enhance views out toward the landscape. A lightweight mesh fence meanders through the landscape plantings to ensure that the play environment is contained.
Work on the interior of the playground included:
- Modifying the water spray feature and interconnected play structure to increase their play value and accessibility, and introducing water spray to the elevated portion of the play structure
- Redesigning the central play zone
- Expanding the swing area to accommodate strap swings for older children
- Replacing most of the sand with sand-toned safety-surface carpet, which is accessible
- Constructing a sand table in a corner of the sand-surfaced area to provide the opportunity for accessible sand play
- Replacing the net climber with a pole climber connected to the pyramid climber, a style choice that is reminiscent of equipment in the original Dattner design
This project is part of the Conservancy’s effort to guide the continued stewardship of Central Park’s 21 playgrounds, as outlined in Plan for Play: A Framework for Rebuilding and Managing Central Park’s Playgrounds.
Nearby Projects
-
Project
Dene Slope Restoration
Our work on the Dene Slope included establishing a meadow of native grasses and wildflowers over several planting seasons, and creating a rustic trail and seating for visitors that contain sweeping new views across the meadow. -
Project
Billy Johnson Playground Renovation
Our renovation of Billy Johnson Playground preserved and reinforced the rustic character of the playground while increasing the play value and improving accessibility. -
Project
Reconstruction of Rumsey Playfield Landscape
The area between the Mall and the East Drive serves as a thoroughfare for millions of visitors each year. Our work on this landscape included the reconstruction of paths and other infrastructure, addition of new landscape plantings and turf, and restoration of Rumsey Playfield’s eastern entrance plaza. -
Project
Naumburg Bandshell Renovation
Our work on the historic Naumburg Bandshell restored lost architectural features, repaired the concrete and limestone masonry, and will help preserve the integrity of the structure for years to come.